The short answer: a restaurant in mainland Dubai needs a trade licence, Dubai Municipality approval as a food establishment with an assessed kitchen layout, landlord and fire safety approval of the fit-out, a signage permit, and trained, medically cleared staff. A restaurant has more to approve than a café because it cooks with heat, smoke and grease: extraction, fire protection and grease management sit at the centre of the process. Extras such as outdoor seating, shisha, music and alcohol each need their own permission.
General information, not legal or licensing advice. Rules, fees and portals change. Confirm every step with the authority concerned or a licensed adviser. Checked on 19 November 2026.
Opening a restaurant in Dubai: the series
- How to open a restaurant in Dubai: the complete checklist
- Licence, approvals, delays and fines
- Kitchen layout, menu by cuisine, staffing and costs
- POS and ERP, website, reservations, delivery apps and Google
Opening a café instead? See how to open a café in Dubai.
Key points
- The hot kitchen drives the approvals: extraction, fire protection and grease trap.
- Have the kitchen layout assessed before any building work starts.
- Every food establishment needs a trained, certified Person in Charge.
- Outdoor seating, shisha, entertainment and alcohol are separate permissions.
- A team of 20 or more may bring Emiratisation obligations.
- We found no official published timeline, so plan with a margin.
Who approves what
| Area | Who to deal with | Restaurant-specific point |
|---|---|---|
| Trade licence | Dubai Department of Economy and Tourism (DET) on the mainland; the free zone authority in a free zone | The licence activity must match what you will actually serve and do |
| Food establishment approval | Dubai Municipality, Food Safety Department | Full kitchen layout assessment and inspection |
| Fit-out | Landlord, mall or master developer, plus the authority with building control | Cooking must be a permitted use of the unit |
| Fire safety | Dubai Civil Defence | Kitchen hoods and cooking equipment bring extra fire protection requirements |
| Signage | DET issues trade-name signage permits | One trade name on the storefront; Arabic above English |
| Outdoor seating | Dubai Municipality guideline, plus landlord consent | Terraces are valuable in winter; plan the permission early |
| Shisha | Dubai Municipality permit | Serving without a permit has led to fines and closures |
| Music, entertainment, events | DET e-permits system | Live music, DJs and ticketed events |
| Staff | Federal labour and residency authorities | Larger teams bring more obligations |
| Tax | Federal Tax Authority | VAT, corporate tax |
We could not open the official DET, Civil Defence and DEWA service pages while preparing this guide, so those rows are stated in general terms. We also could not confirm which body currently issues alcohol licences in Dubai, as published sources conflict; ask a licensed adviser if your concept depends on it.
Step 1: The trade licence
The UAE government portal sets out the stages for a mainland business: choosing the activity and legal form, registering the trade name, initial approval, arranging a location, additional government approvals and the licence itself (u.ae). The tenancy is registered through Ejari. UAE law allows 100% foreign ownership of mainland companies in most activities (u.ae), and Dubai applied this to more than 1,000 commercial and industrial activities from 1 June 2021 (Dubai Media Office). Confirm it for your activity.
Almost 1,200 new restaurant licences were issued in Dubai in 2024, according to the Department of Economy and Tourism. We could not confirm official fees; ask for a written quote.
Step 2: Dubai Municipality and the kitchen layout
Licensing a food establishment is subject to Municipality approval (Local Order 11 of 2003), and Dubai Municipality lists a “Request for Layout Assessment for Food Establishment Licensing” service (Dubai Municipality). For a restaurant, the layout is a full commercial kitchen, and it should be assessed before the contractor starts.
We could not open the Municipality’s detailed requirement documents, so no official dimensions are given here. A restaurant layout normally has to show:
- A one-way flow from goods receiving to storage, preparation, cooking, the pass and service, with dirty returns kept separate.
- Separate preparation areas or times for raw meat, poultry, fish and ready-to-eat food.
- Walk-in or reach-in cold storage and dry storage sized to the menu.
- Extraction hoods over all cooking equipment, with a duct route to the outside.
- A grease trap sized for the kitchen.
- Staff handwash basins in each area, separate from food sinks.
- A wash-up area with pot wash and dishwasher.
- Cleanable floors, walls and ceilings, and proper drainage.
- Waste storage, pest control, chemical storage and staff changing space.
Use a kitchen designer who has had restaurant layouts approved in Dubai recently. See kitchen layout, menu and staffing.
Step 3: Fit-out, extraction and fire safety
| Item | Why it matters for a restaurant |
|---|---|
| Permitted use | Not every unit allows cooking. Check the lease and the building rules first |
| Extraction route | The duct must reach an approved discharge point, often the roof. No route means no hot kitchen |
| Fire protection | Cooking with grease usually requires a fire suppression system in the hood, plus alarms and extinguishers approved by Civil Defence |
| Gas | Piped gas, cylinders or all-electric: each has its own approval and safety requirements |
| Grease trap | Needs space, access for cleaning and a service contract |
| Landlord approvals | Drawings, contractor details, insurance, a fit-out deposit and a final inspection |
| Smoke and smell | Charcoal, tandoor and wood-fired cooking may need extra filtration and landlord consent |
Ask the landlord for the fit-out guide before signing. It lists the approvals, deposits and timelines for that building.
Step 4: Signage, terrace and extras
- Signage: DET issues trade-name signage permits and inspects shopfronts under the 2024 Outdoor Advertising Manual. Reported rules include one trade name per storefront and Arabic above English (Khaleej Times, 13 May 2026).
- Outdoor seating: Dubai Municipality publishes an Outdoor Seating Area Guideline.
- Shisha: needs a Municipality permit. In 2020 the Municipality reported fining 133 cafés and closing eight, including for serving shisha without a valid permit (Dubai Municipality).
- Music and events: permits are handled through the DET e-permits system.
- Ramadan: restaurants continue to operate normally during the day (Khaleej Times, February 2026).
Step 5: Staff rules
- Person in Charge: every food establishment must appoint a trained, certified PIC (Dubai Municipality).
- Occupational health card: required for food workers (Local Order 11 of 2003).
- Health insurance: employers must provide it and may not charge employees (Dubai Law 11 of 2013).
- Wages: the enhanced Wage Protection System took effect on 1 June 2026, with wages due by the first day of the following month (EY tax alert).
- Emiratisation: under rules reported in 2023, firms with 20 to 49 staff in 14 sectors, including hospitality, had to employ one UAE national in 2024 and another in 2025, with financial penalties for non-compliance (Gulf News). We did not confirm the rules for 2026 onwards, so check the current position if your team will reach 20.
- Visas: we could not confirm current official costs. Ask for a written cost per employee.
Step 6: Tax and fees on the bill
| Item | What the source says |
|---|---|
| VAT | Mandatory registration threshold AED 375,000 (Federal Tax Authority) |
| Corporate tax | 0% up to AED 375,000 of taxable income, 9% above (u.ae) |
| Municipality fee | Reduced from 10% to 7% on sales at restaurants and hotels in 2018 (Khaleej Times). It did not apply to every restaurant |
| 2026 relief | A package announced on 21 May 2026 included an exemption from the sales fees on hotel rooms and restaurants for DET-registered establishments (Khaleej Times). Dates were not published in the reports we read |
Ask an accountant which of these apply to your licence and location before printing menu prices.
How long does it take, and why it slips
We found no official published timeline. Consultancy websites quote ranges that do not agree. A restaurant generally takes longer than a café because the kitchen is larger and has more to approve. The causes of delay below are what we see and hear from clients, not official figures.
| Cause | How to avoid it |
|---|---|
| No approved extraction route | Confirm the duct route with the landlord in writing before signing |
| Building started before the layout was assessed | Assess first, build second |
| Menu changed after drawings were submitted | Freeze the menu and equipment list before submission |
| Long-lead kitchen equipment | Order combi ovens, hoods and cold rooms early |
| Landlord approvals slower than expected | Get the fit-out guide and timelines before signing |
| Gas and utility connections | Apply as early as the process allows |
| Staff visas, health cards and training | Recruit during the fit-out |
| Failed inspection | Run a mock inspection with the contractor and Person in Charge |
Inspections, fines and closures
| Fact | Source |
|---|---|
| 34,700 food inspection visits in Dubai in the first half of 2025 | Dubai Municipality |
| 24,820 inspections in the first five months of 2026 | Gulf News, 8 June 2026 |
| 247 food establishments closed in the first half of 2021, 168 of them for food safety violations | Gulf News, 13 July 2021 |
| Two mall food-court outlets temporarily shut in 2016 after a cockroach complaint | Khaleej Times, 25 August 2016 |
| Fines under the public health order range from AED 100 to AED 500,000; a licence may be suspended | Local Order 11 of 2003, Article 86 |
| Plans announced for AI-supported food safety checks, including scanning customer reviews | Khaleej Times, 16 November 2026 |
A newer public health law (Dubai Law 5 of 2025) exists and we could not open its fine schedules, so check the current position. A closure is public and is reported in the press, so the reputational cost is usually larger than the fine.
Staying compliant
- Daily temperature, cleaning and delivery records.
- Active pest control, grease trap, hood cleaning and fire system service contracts.
- Licence, health card and training renewals in a calendar.
- No new cooking equipment, shisha, terrace seating or sign without its approval.
- Allergen information kept accurate when the menu changes.
Where Food On Focus fits in
We are a marketing and content agency, not licensing consultants. We work on the brand, menu design, photography, video and launch, planned alongside the fit-out so marketing is ready when approvals arrive. Continue with the systems to set up before opening, or go back to the complete checklist.
Frequently asked questions
What licence do I need to open a restaurant in Dubai?
A trade licence for the restaurant activity, issued on the mainland by the Department of Economy and Tourism or by the free zone authority in a free zone, plus Dubai Municipality approval as a food establishment. Confirm the exact activity and fees with the authority or a licensed adviser.
What approvals does a restaurant kitchen need in Dubai?
A layout assessment by Dubai Municipality, landlord approval of the fit-out, and fire safety approval. Cooking with heat and grease brings extraction, fire protection and grease trap requirements.
Can a foreigner own 100% of a restaurant in Dubai?
UAE law allows 100% foreign ownership of mainland companies in most activities. Confirm it for your specific activity.
How long does it take to open a restaurant in Dubai?
We found no official published timeline. A restaurant generally takes longer than a café because the kitchen is larger. Plan with a margin and do not announce an opening date until approvals are in hand.
Do I need a permit for shisha or outdoor seating in Dubai?
Yes. Shisha needs a Dubai Municipality permit, and Dubai Municipality publishes a guideline for outdoor seating areas. Landlord consent is normally needed too.
What are the fines for food safety violations in Dubai?
Dubai's public health order of 2003 sets fines from AED 100 to AED 500,000 and allows a licence to be suspended. A newer public health law exists, so check the current schedule with Dubai Municipality.
Sources
- UAE Government portal: steps to start a business on the mainland
- UAE Government portal: full foreign ownership
- Dubai Media Office: full ownership procedures (3 June 2021)
- Dubai Department of Economy and Tourism: gastronomy industry in 2024 (via Zawya)
- Dubai Municipality: information for food establishments
- Dubai Local Order 11 of 2003 concerning public health
- Dubai Municipality: Person in Charge programme
- Dubai Municipality: outdoor seating area guideline
- Khaleej Times: shop signage rules (13 May 2026)
- Dubai Municipality: shisha café fines (9 August 2020)
- Khaleej Times: Ramadan 2026 in Dubai
- Dubai Law 11 of 2013: health insurance
- EY: enhanced Wage Protection System
- Gulf News: Emiratisation for firms with 20 to 49 staff (30 November 2023)
- Federal Tax Authority: VAT registration
- UAE Government portal: corporate tax
- Khaleej Times: Dubai cuts fees on hotels and restaurants (12 June 2018)
- Khaleej Times: Dubai economic incentives package (21 May 2026)
- Dubai Municipality: food inspections in H1 2025
- Gulf News: food inspections in early 2026
- Gulf News: food outlet closures in H1 2021
- Khaleej Times: food court outlets shut (25 August 2016)
- Khaleej Times: AI food safety checks (16 November 2026)
Disclaimer: This article shares general guidance based on Food On Focus Media's experience as a Dubai F&B creative agency. It is for information only and is not a substitute for advice tailored to your specific brand, menu or market.




